Managing Drawing Revisions in CNC Machining

September 26, 2020by ChinaCNC0

A practical CNC machining guide to controlling drawing revisions on outsourced CNC orders. Use the drawing and purchase order to agree on the requirements before cutting material.

Put the released part number and drawing revision on the purchase order. If a STEP file and PDF disagree, obtain written clarification before machining.

On repeat orders, check the new files against the previously approved revision. Changes to a bore, finish or datum may require a new inspection setup or first article.

Keep a record of the requirements agreed at quotation. Tie the purchase order and supporting files to the released drawing and ask how changes will affect lead time, price and inspection.

A short technical exchange before placing the order can resolve costly assumptions. Give the supplier enough information to quote the finished part and define how acceptance will be checked.

Agree on the approval sequence before releasing a batch. Where a sample is required, confirm who signs off, which revisions are covered and what results must be recorded before machining the remaining quantity.

For repeat batches, reference the approved files and quantities. Flag changes to the finish or mating parts and agree whether they require a new sample before production.

Confirm the part specification, quantity and acceptance criteria with your machining supplier before order release.