AddressChongqing, Shenzhen & Dongguan, China
Call us+86 185 2332 4823
Write us[email protected]

China CNC Machining FAQ

Sourcing custom machined parts from China? Find out what to send for a quote, how to compare suppliers and what to agree on before approving a production run.

Getting a quoteOrdering CNC Machined Parts from China

What files do I need for a CNC machining quote?

Send a STEP model and a dimensioned PDF drawing with the same revision. Include the material grade, finish, quantities, delivery destination and required arrival date. The model describes the shape. The drawing identifies threads, fits, datums and inspection requirements that may be missing from the model. If you have only one file, send it and flag what still needs defining.

How much does CNC machining cost in China?

The price depends on stock size, machining time, setups, finishing, inspection and batch size. A small part with deep pockets and tight tolerances can cost more than a larger, simpler part. Ask for separate setup charges and unit prices at your expected quantities so you can see where the cost changes.

How do I compare quotes from Chinese CNC suppliers?

Ask each supplier to quote the same drawing revision, material grade, quantity and finish. Compare what each price includes: tooling, inspection reports, packaging, freight and delivery terms. A low unit price tells you little if one quote covers finished parts delivered to your door and another covers unfinished parts collected at the factory.

Can I order one CNC prototype, and is there a minimum order?

CNCNC reviews single prototypes and small batches. The practical minimum depends on the stock purchase, fixturing and any minimum charge for finishing. Request prices for one sample and the intended production batch separately. This shows how much of the prototype price comes from one-time setup.

How long does CNC machining and shipping from China take?

Request a dispatch date and an estimated arrival date. Material availability, machine setup, finishing and inspection affect production time. Freight service and customs clearance affect transit. If you need to approve a sample first, give separate deadlines for the sample and the production batch.

Can I request an NDA before sharing CAD files?

Yes. If your project requires a nondisclosure agreement, send the proposed terms to [email protected] before sending confidential drawings. Identify the parties and files covered, then share the design after both sides have agreed to the terms.

https://chinacnc.cc/wp-content/uploads/2020/10/post_21.jpg
Request a quote

Have a drawing ready for review?

Send the revision, material grade and quantity to [email protected].
https://chinacnc.cc/wp-content/uploads/2020/10/post_18-1280x1280.jpg

For a press-fit bushing, mark the bore tolerance and state whether it applies after coating. Those two details change how the part is machined and checked.

Engineering and qualityMachining Specifications and Inspection

What tolerances can CNCNC hold on machined parts?

We confirm tolerances feature by feature after reviewing the material, geometry, finish and measurement method. A bearing bore, for example, may need a close fit while the outside profile can use the general drawing tolerance. Identify the mating part, datum and critical dimensions so we can confirm feasibility and quote the inspection work.

How do I specify a material for CNC machining?

Give the grade, applicable standard and condition, such as 6061-T6 aluminum. If you are open to a locally available equivalent, say so and require approval before substitution. Request a material certificate or lot traceability at quotation if your receiving inspection needs it.

Does my part need CNC milling or turning?

Turning is generally suited to features around a common axis, such as shaft diameters, grooves and threads. Milling suits pockets, flat faces and hole patterns. A shaft with cross-holes or wrench flats may need both. Send the complete drawing so the quote accounts for secondary setups.

How should I specify surface finish and coating?

Specify surface roughness separately from the coating or treatment. Mark the faces that need a particular roughness, cosmetic appearance or masking. For an anodized housing, state whether a critical bore must meet its size requirement after anodizing. That detail affects both machining allowance and final inspection.

How can I verify part quality before shipment?

Agree on the inspection plan before ordering. Identify critical features, sampling requirements, gauges or measurement methods, and the records you need. For a shaft, a diameter reading alone does not verify runout relative to a datum. Request measured results against the relevant drawing callouts and agree when shipment can be released.

Can I approve a first article before repeat production?

Ask for a sample approval step on the purchase order. Define the drawing revision, sample quantity, dimensions to report and who can release the batch. If the sample leads to a design change, issue a new revision and confirm its effect on tooling, price and lead time before authorizing production.

Supplier selectionMore Questions Before You OrderFAQ

Use these checks when moving from supplier evaluation to a purchase order.

Where does CNCNC manufacture parts?

CNCNC has manufacturing bases in Chongqing, Shenzhen and Dongguan. Ask which location will machine and inspect your part if your approval is site-specific.

How can I reduce machining costs?

Review deep pockets, small internal radii and tight tolerances on non-mating faces. Ask which drawing change would reduce setups or cutting time while preserving function.

How do I verify supplier certifications?

Request the current certificate for the legal entity and site doing the work. Check its scope and validity against your purchasing requirements before placing the order.

What if a part fails inspection?

Identify the part number, drawing revision, lot, measured value and measurement method. Send the findings and agree on disposition before reworking or returning parts.

How do I reorder the same part?

Reference the previous order and approved drawing revision. Flag changes to the finish, material, quantity or inspection plan so the new quote reflects them.